Milestone | ||
2004 - Dismantling, Packing & Transportation of 2 Nos. 19.5 MW FiatAvio Gas Turbines in Belgium |
||
2005 - Supply of Capital Parts (Buckets Row 2 & 4) For MHI Make Model MW701D Gas Turbine (111.2 MW) to NTPC Limited, Auraiya. |
||
2006 - First Major Overhaul Of GT Unit # 1 to Oil India Limited, Duliajan. |
||
2007 - Supply of Turbine Blades Row#3 For MHI Make Model MW701D Gas Turbine (111.2 MW) to NTPC Limited, Auraiya. |
||
2008 - Supply of Compressor Diaphragms Row 1-19 and One Complete Set of Compressor Blades of Westinghouse Make W251B11/12 Model Gas Turbine to Spectrum Power Generation Limited, Kakinada. |
||
2009 - Supply of Compressor Blades Row# 2 and Penflex Tubes - 4 Nos. of Westinghouse Make W251B11/12 Model Gas Turbine to Spectrum Power Generation Limited, Kakinada |
||
2010- Supply of GE Fr 6B Hot Gas Path Components (Buckets, Nozzles and Shrouds) and Complete Extendorized, Upgraded Combustion Spares to Reliance Industries Limited, Mumbai. |
||
Up-gradation of GE Fr.6B Gas Turbine Generator from 6541 to 6581 along with changing of Mark 6 Control Constants suitable for higher firing temperature (2084 F) at Reliance Industries Limited, Patalaganga. |
||
Repair & Refurbishment of Major Components (Buckets Row # 1, 2 & 3, Vanes Row # 1, 2 & 3, combustion Components and Compressor Diaphragms Row 1 to 19) of Westinghouse Make W251B11/12 Model Gas Turbine to Spectrum Power Generation Limited, Kakinada. |
||
2011 – Combustion Inspection of all 3 Fr.5 Gas Turbine units and Boroscopic Inspection of unit #3 Fr.5 Gas Turbine at Reliance Industries Limited, Nagathone. |
||
2013 : Repair & Refurbishment of Fr.9E Stage #1 and 3 Buckets being successfully carried out for M/s NTPC Limited, Kayankulam. |
||
Supply of Complete Fr.6B Gas Turbine HGPI Spares both Capital Parts, Hardware & Consumables to Andhra Pradesh Gas Power Corporation Limited (APGPCL), Vijjeswaram. |